胡 心慈
专任
职称 助理教授
姓名 胡 心慈
联络电话 6315
电子邮件 hthu@uch.edu.tw
研究专长 建筑资讯模型
专案管理
实务专长 模型建置
软件应用
学历 国立台北科技大学土木与防灾博士班 营建、交通、防灾管理组博士
国立高雄科技大学营建工程系
经历 健行科技大学物业经营与管理系 兼任助理教授

研究与产学 Lin, Y.C., Hsu, Y.T., Hu, H.T., BIM Model Management for BIM-Based Facility Management in Buildings, Advances in Civil Engineering, 2022, 1901201.

Lin, Y.-C., Lo, N.-H., Hu, H.-T., Hsu, Y.-T., Collaboration-Based BIM Model Development Management System for General Contractors in Infrastructure Projects, Journal of Advanced Transportation, 2022.

Lin, Y.-C., Lin, C.-P., Shueh, T.-S., Hu, H.-T., A study on BIM implementation of construction projects for PCM during the construction phase | 施工阶段PCM 执行建筑工程BIM 专案实务之研究, Journal of the Chinese Institute of Civil and Hydraulic Engineering, 2020, 32(2), P.239-250.

Lin, Y.-C., Lin, C.-P., Hu, H.-T., Su, Y.-C., Developing Final As-built BIM Model Management System for Owners during Project Closeout, Advanced Engineering Informatics, 2018, 36, P.178-193.

Lin, Y.-C., Yen, C.-P., Hu, H.-T., Applications of Civil Information Modeling (CIM) for constructability review in railway construction projects, ACM International Conference Proceeding Series, 2017, Part F131932, P102–106.

Cheng-Ping Lin, Yu-Cheng Lin*, Hsin-Tzu Hu. Developing Construction As-built BIM Models Management Approach Integrated with Configuration Management, Journal of the Chinese Institute of Civil and Hydraulic Engineering, Special Issue, Vol.29, No.1, 7-16, 2017.

Cheng-Ping Lin, Yu-Cheng Lin*, Hsin-Tzu Hu, Chun-Kai Huang. The Study of As-built BIM Models Inspection Approach in Construction: A Case Study, Journal of the Chinese Institute of Civil and Hydraulic Engineering, Special Issue, Vol.28, No.4, 295-304, 2016.
Hsin-Tzu Hu*, Cheng-Ping Lin and Yu-Cheng Lin.

Hsin-Tzu Hu*, Cheng-Ping Lin, Yu-Cheng Lin. Developing Final As-built Model Management Approach for General Contractor beyond Project Closeout., Proceedings of the 3rd International Conference on Civil and Building Engineering Informatics (ICCBEI 2017) & 2017 Conference on Computer Applications in Civil and Hydraulic Engineering (CCACHE 2017), 10-13, Taipei, Taiwan.

Integrated Building Information Modelling (eBook), Cheng-Ping Lin, Yu-Cheng Lin, Chun-Kai Huang, Hsin-Tzu Hu, A Case Study of Preparing and Managing Final As-Built Model for Owner Beyond Project Closeout, 2017, P.102-120 (19) 2017.

Applications of Configuration Management in BIM Models Management during the Construction Phase, The 16th International Conference on Computing in Civil and Building Engineering (ICCCBE2016), 593-600, Osaka, Japan, 2016.

陈桂茂、胡心慈、林祐正,建筑工程BIM竣工模型验收模式之研究,2019年第23届营建工程与管理学术研讨会,台中。(优等论文奖)

胡心慈 、林正平、林祐正,型态管理应用于BIM模型管理实务应用之探讨-以营造厂为例,2015电子计算机于土木水利工程应用研讨会,台中。

胡心慈 、林正平、林祐正,型态管理在BIM模型建置管理应用之研究,2015年第19届营建工程与管理学术研讨会,高雄。(最佳论文奖)
证照 家具木工丙级